Skip to main content

    Airport

    Airport Experience

    Transform airport business and operation using the Virtual Twin Experience

    The airport can optimize its operational performance by running What-If scenarios based on simulation data and/or real data in the virtual world.

    Download flyerPDF, 1.3 MB
    • Reduce CAPEX

      Reduce CAPEX by federating all data from various suppliers and generate a master referential allowing the Airport to test and validate design quality and compliancy with regulations. It also provides the capabilities to run virtual simulations to improve design sustainability.

    • Collaboration with suppliers

      Improve collaboration with suppliers around a unique 3D mockup, reduce design cost by 20%.

    • Design integration and quality

      Improve design integration and quality, reduce error rates and change orders by 30%.

    • Reduce OPEX

      Reduce OPEX by connecting the Airport Virtual Experience with IoT to monitor asset performance in real time and provide 3D asset analytics to help anticipate future asset failures, as well as by optimizing airport resource allocations depending on flight information and passenger traffic.

    • A unique referential

      A unique referential for all users to intuitively search and navigate the asset information, decreasing incident response time and increasing asset availability, increased overall efficiency by 50% while reducing maintenance cost by 30%.

    • Optimize resource allocation

      Improve and optimize the allocation of aircraft stands, gates, baggage belts and check-in counters, resulting in increased overall efficiency, reliability and passenger satisfaction, reduce operations cost by 20%, increased overall efficiency by 50% and increase passenger traffic by 20%.

    4 processes

    Each one is run by roles you license. Open one to see them.